Real-time construction profitability: Automatic analysis by Dropia.io
News & Insights
5 minMin Read
Real-time project profitability with Dropia.io: live dashboards, automatic alerts, early detection of deviations to maximize your construction margins.
In construction, waiting until the end of a project to know its profitability is like driving with your eyes closed. Real-time profitability changes everything: you manage your projects with constant visibility, you detect problems as they arise, and you optimize continuously. Dropia.io makes this real-time profitability accessible to all SMEs.
What is real-time profitability?
Definition
Real-time profitability means you can know at any moment:
The actual cost spent to date on each project
The percentage of the budget consumed
The projected margin if the current trend continues
The discrepancies compared to forecasts
Difference with the traditional approach
Traditional approach:
Analysis done manually once a week or month
Stale snapshot, already obsolete at the time of its production
Delay of 1-4 weeks between a problem and its detection
Late reaction, damage already significant
Real-time approach with Dropia :
Automatic update with each time entry or expense
Always current vision
Immediate detection of anomalies
Quick reaction, early correction
The decisive advantage
A project that drifts by 1% per week may seem trivial. But over 6 months of work, that represents 25% of cumulative drift. Detecting and correcting the drift in the first week saves the project.
The Dropia real-time profitability dashboard
Multi-project overview
The main Dropia dashboard displays all your active projects with for each:
Visual status : green (profitable), orange (attention), red (drift)
Physical progress : percentage of completion
Budget consumed : percentage of budget spent
Progress/budget discrepancy : the critical indicator
Projected margin : projection of the final margin
Active alerts : number of alerts requiring action
This view allows you to identify in 10 seconds which projects need attention.
Detailed view by project
By clicking on a project, you access:
Financial indicators
Client quote: total amount
Total budget: projected cost
Actual cost to date: what has been spent
Discrepancy: budget vs actual difference
Current margin: projected if stopped today
Projected margin: if current trend continues
Cost breakdown
Labor costs (hours × hourly rate)
Supply and material costs
Other costs (rent, subcontracting, etc.)
Visualization in pie chart
Temporal evolution
Chart showing the evolution of actual cost vs budget over time
Allows seeing if a project is accelerating its consumption
Detection of problematic periods
Task detail
Each task of the project with its budget and actuals
Identification of profitable vs loss-making tasks
Base for optimizing remaining tasks
Real-time updates
Each action instantly updates the indicators:
Hour entry (8:15 AM) : Jean logs 8 hours on the "Villa Durand" project → Dropia automatically adds 8h × 45€ = 360€ to the actual cost → The dashboard updates instantly → If this triggers a threshold alert, notification is sent
Receiving supplies (2:30 PM) : Delivery of materials for 2,500€ logged on mobile → Automatic addition to project costs → Comparison with supply budget → Alert if exceeded
End of day : All time entries and expenses are integrated → Exact vision of the situation that evening → No delay, no re-entry
Automatic real-time alerts
Budget exceeding alert (configurable)
Standard configuration : alert at 80% of budget consumed
Example: Project "Office Renovation", budget 45,000€
At 36,000€ spent (80%), automatic alert sent
Email + app notification to the project manager
Dashboard turns orange
Progress/consumption discrepancy alert
Trigger: consumption > progress + 10%
Example: Project at 50% progress but 65% of budget consumed
Automatic alert "drift detected"
Indication of the discrepancy: 15 points
Suggested action: verify productivity and review organization
Critical margin alert
Trigger: projected margin < defined threshold (e.g., 5%)
Example: Project whose projected margin falls below 5%
Alert "critical profitability"
Requires immediate detailed analysis
Decision: corrective actions or client negotiation
Productivity alert
Trigger: actual hourly cost > projected + 15%
Example: Task budgeted at 40€/hour but actually costs 48€/hour
Alert "insufficient productivity"
Identification of possible causes
Action: training, reassignment, revision of method
Customizing alerts
Each company configures its own thresholds based on:
Its margin strategy
Its level of risk tolerance
Its usual sector margins
Its specific constraints
Dropia allows fine granularity: global thresholds and project-specific thresholds if necessary.
Use case: Real-time intervention on a project in drift
Context
Project "Extension Pavilion", quote 68,000€, total budget 58,000€, target margin 10,000€ (14.7%)
Week 3: First Dropia alert
Dropia dashboard:
Progress: 25%
Budget consumed: 32% (18,560€)
Discrepancy: +7 points
Orange alert: "consumption higher than progress"
Detailed analysis:
Actual hourly cost: 52€/hour vs 45€/hour projected (+15%)
Hours consumed: 280h vs 232h budgeted at 25% progress
Supplies: compliant with budget
Immediate action: The site manager is notified on Monday morning. He analyzes and identifies:
A junior worker less productive than expected
Non-optimal working methods on one task
Corrections applied week 4:
Reassignment of the junior worker to suitable tasks
Training of the team leader on optimized method
Temporary reinforcement with a senior worker
Week 6: Effectiveness check
Dropia dashboard:
Progress: 50%
Budget consumed: 52%
Discrepancy: only +2 points
Green alert: "trajectory corrected"
Analysis:
Hourly cost weeks 4-6: 46€/hour (almost compliant)
The corrections paid off
Final margin projection: 9,200€ (13.5%) - acceptable
Final result
Thanks to early detection via Dropia, the project finishes with a 13.2% margin instead of the 8-9% that were projected without correction.
Without Dropia: The problem would have been detected at best in weeks 8-10, too late to correct effectively. Estimated loss: 3,000 to 4,000€.
Real-time profitability and decision making
Daily decision: Resource allocation
Every morning, the site manager consults the Dropia dashboard:
Project A: ahead, can lend a worker
Project B: in drift, needs reinforcement
→ Immediate reassignment optimizing overall profitability
Weekly decision: Prioritizing projects
During the Monday meeting:
Identification of 2-3 projects needing priority attention
Allocation of site managers' time accordingly
Decisions based on factual data, not impressions
Monthly decision: Commercial strategy
The consolidated analysis Dropia shows:
The most profitable types of projects
The most profitable clients
The skills to strengthen
→ Guidance for commercial prospecting
Annual decision: Investments
The profitability history allows deciding:
Should we hire? What profile?
What equipment to buy to improve productivity?
Which training to prioritize?
Should we specialize or diversify?
Testimonial: Interior works company, 18 employees
"Real-time profitability has transformed our management"
Sylvie, manager:
"Before Dropia, we discovered unpleasant surprises at the end of a project. 'Oh, we thought we would make a 15% margin, but we are at 8%.' Too late.
Now, with the real-time dashboard, I see every morning where each project stands. If a signal turns orange, we investigate on the same day. My site managers love it: they are no longer in the dark, they manage with real numbers.
The impact on our profitability is measurable: we went from an average margin of 11% to 14.5% in a year. On 1.2M€ of revenue, that means 42,000€ more in profit. For an investment of 598€/year in Dropia, the ROI is 70x.
And it changes everything in terms of stress too. Before I slept poorly wondering if a certain project would go well. Now I know, in real-time. It’s reassuring even when there are problems because we see them coming."
How to activate real-time profitability with Dropia
Phase 1: Configuration (1 hour)
Entry of charged hourly rates by profile
Configuration of custom alert thresholds
Setting up notifications (who receives what alerts)
Phase 2: Entry of active projects (10 min/project)
For each project:
Quote amount, detailed projected budget
Initial progress if the project has already started
Specific alert thresholds if needed
Phase 3: Operational use (automatic)
Time entries automatically feed the costs
Logged supplies are integrated
Indicators update in real-time
Alerts are sent automatically
Phase 4: Management rituals (15 min/day)
Morning consultation of the dashboard
Processing of received alerts
Corrective actions if necessary
That’s it!
The limits of real-time profitability (and how to overcome them)
Limit 1: Requires strict time logging
If time entries are not made or are delayed, real-time profitability loses its relevance.
Dropia solution: Mobile time logging is so simple (10 seconds) that adoption is natural. Automatic reminders in case of forgetfulness ensure completeness.
Limit 2: Physical progress remains manual
The percentage of progress must be estimated manually (unless based on completed tasks).
Dropia solution: Quick update of progress (30 seconds) during site visits. Accuracy improves with practice.
Limit 3: Can generate stress if poorly managed
Constantly seeing numbers can stress some people.
Solution: Use alerts to focus only on what needs attention. No need to monitor everything all the time.
Conclusion: Management instead of hope
Before real-time profitability, managing construction projects often relied on hope: "I hope this project goes well." With Dropia’s real-time profitability, you move from hope to management: you know, you anticipate, you correct.
This mental and operational transformation has a direct impact on results. Companies that manage in real-time gain an average of 2 to 5 margin points. In the long term, it’s the difference between surviving and thriving.
And contrary to what one might think, this power is not reserved for large companies with financial controllers. Dropia makes real-time profitability accessible to SMEs for less than 60€/month.









